Power Infrastructure Before Real Estate

MetalWave develops around power. We secure strategic sites, build the infrastructure that makes them usable, and deliver development-ready capacity to operators who need it.

Our Model

Land is the easy part. Power is the constraint.

Most data center site searches begin with acreage and end at the interconnection queue. MetalWave inverts that order: we evaluate deliverable capacity, utility posture, and schedule first, and only then commit to land. The result is a site that can actually be built on.

01

Develop around power

Utility capacity and interconnection outlook drive site selection.

02

Secure strategic sites

Site control near power, fiber, water, transportation, and gas.

03

Build infrastructure

Substations, transformers, switchgear, and balance-of-site works.

04

Deliver ready capacity

Development-ready environments for large loads and data centers.

Company Story

Capability built by operating

MetalWave’s operating history in large-load infrastructure created deep experience in Texas power markets, site development, utility coordination, energization, and 24/7 operations. Those capabilities now support the company’s growing powered land and data center development platform.

That history matters commercially, not sentimentally. A team that has energized sites and run them continuously understands where schedules actually slip — equipment lead times, study timelines, utility sequencing, and the balance-of-site work that rarely appears in a site brochure.

MetalWave Energy Inc. was established in 2023 and focuses on Texas and the ERCOT market.

Where this is applied

  • Real Texas power assets under ownership or control
  • Operating infrastructure with continuous 24/7 operations experience
  • Utility and ERCOT engagement across multiple service territories
  • A growing powered land pipeline across two Texas corridors
  • Development delivered through energization, not handed off at land

Portfolio

Assets behind the platform

Figures describe owned and controlled assets and development opportunities at varying stages. Capacity is not presented as secured or contracted unless expressly stated.

130 MW

Power Portfolio

Owned / controlled power assets across operating and development-stage capacity.

99 MW

Near-Term Development Capacity

Edna 25 MW near-term capacity and Clifton 74 MW target development capacity.

650+ MW

Potential Development Pipeline

Sites at varying stages of development across ERCOT. Not presented as secured capacity.

ERCOT

Texas Market Focus

Development concentrated in the DFW region and the Houston–San Antonio corridor.

Core Capabilities

What MetalWave does in-house

  • Power

    Utility capacity assessment, grid studies, on-site generation, and energy strategy — applied before a site is committed to.

  • Development

    Site control, due diligence, permitting coordination, and delivery of development-ready environments.

  • ERCOT

    Texas market experience across large-load development, interconnection, and market participation through affiliated entities.

  • Execution

    Built and energized infrastructure, with continuous operating experience behind it.

  • Site Pipeline

    A growing set of power-oriented Texas sites across the DFW region and the Houston–San Antonio corridor.

Development Sequence

From Raw Land to Powered Infrastructure

  1. 1

    Land

    Strategic land acquisition and site control near power, fiber, water, transportation, and gas infrastructure.

  2. 2

    Power

    Utility capacity assessment, grid studies, on-site generation opportunities, and energy strategy.

  3. 3

    Interconnection

    Utility engagement, study coordination, transmission / distribution interface, and energization planning.

  4. 4

    Infrastructure

    Substations, transformers, switchgear, fiber, water, cooling, roads, and balance-of-site infrastructure.

  5. 5

    Compute

    Development-ready environments for data centers, AI infrastructure, HPC, and flexible large loads.

Company Timeline

Restrained milestones

  1. 2023

    MetalWave Energy Inc. established

    Founded as a Texas-focused power infrastructure and development business.

  2. Large-load operations

    Midland power portfolio built and energized

    120 MW across four West Texas sites, of which 80 MW is operating and 40 MW is development and expansion capacity.

  3. 2025

    Childress energized

    A 10 MW project on 13.8 kV distribution carried from interconnection through to operations.

  4. Current

    Powered land and data center development platform

    Clifton advanced as the priority data center development, alongside a 650+ MW potential Texas pipeline.

Access to REP, LSE, and QSE capabilities through affiliated companies. Through affiliated energy-market entities, MetalWave integrates retail power procurement, load management, scheduling, and ERCOT market participation into its infrastructure platform.

Work With MetalWave

Let's build around power

Whether you need capacity, a development partner, or an infrastructure investment, the conversation starts with your required MW, market, and schedule.