ERCOT Expertise. Infrastructure Execution.

MetalWave approaches digital infrastructure from the power side first. Deliverable large-load capacity on a credible schedule is the scarce input — everything else follows from it.

Energy Flow

From the ERCOT market to the customer's load

MetalWave participates across the chain — market capability through affiliated entities, site power infrastructure directly, and delivery to the point of use.

Stage 1

ERCOT / Utility

Wholesale market and utility delivery point.

Stage 2

Energy Market Capability

Procurement, scheduling, settlement, and load management through affiliated energy-market entities.

Stage 3

Site Power Infrastructure

Substation, transformers, switchgear, and distribution to the point of use.

Stage 4

Data Center / Industrial Load

Development-ready capacity delivered to the customer's load.

Optional side inputs → Site Power Infrastructure

BESS

Storage integration for flexibility and firming.

On-Site Generation

Natural gas and on-site generation opportunities.

Simplified energy flow. Actual configuration is established on a project-specific basis.

Energy Market Capabilities

Integrated ERCOT market capabilities through affiliated energy-market entities

Access to REP, LSE, and QSE capabilities is provided through affiliated companies. Through those affiliated energy-market entities, MetalWave integrates retail power procurement, load management, scheduling, and ERCOT market participation into its infrastructure platform.

Capabilities accessed through affiliated entities

  • Retail power procurement
  • Load management
  • Scheduling
  • Settlement
  • ERCOT market participation

MetalWave Energy Inc. does not represent that it directly holds REP, LSE, or QSE licenses. These capabilities are integrated through affiliated companies.

Capabilities

Power Is the Foundation

Texas Power Market

ERCOT is a distinct market with its own interconnection process, congestion behaviour, and large-load dynamics. MetalWave develops inside it rather than around it.

  • ERCOT market experience across large-load development
  • Nodal price and congestion awareness in site selection
  • Zone-level positioning across ERCOT North and the coastal corridors

Utility Coordination

Utility posture determines schedule. Early engagement establishes what capacity is deliverable, at what voltage, and when — before a site is committed.

  • Utility capacity assessment and early engagement
  • System and interconnection study coordination
  • Transmission and distribution interface management
  • Energization planning and sequencing

Site Power Infrastructure

The physical works that convert an interconnection into usable capacity: substations, transformers, switchgear, and distribution to the point of use.

  • Substation development
  • Transformer and switchgear installation
  • Distribution to the customer's point of use
  • Balance-of-site electrical infrastructure

Flexibility & Generation

Storage, on-site generation, and demand flexibility widen what a site can offer and how it participates in the market.

  • BESS integration
  • On-site generation
  • Natural gas generation opportunities
  • Demand flexibility and power-market optimization

Full capability set

  • Utility coordination
  • ERCOT market experience
  • Large-load development
  • Transmission and distribution interface
  • Substation development
  • Energy procurement
  • Load management
  • BESS integration
  • On-site generation
  • Natural gas generation opportunities
  • Demand flexibility
  • Power-market optimization

Execution

Infrastructure that was actually energized

Market capability without execution is advisory. MetalWave's Childress project is a complete record of an infrastructure project carried from interconnection to operations.

Infrastructure Project
10 MWInfrastructure Project
Distribution
13.8 kVDistribution
Energized
2025Energized

Childress execution timeline

  1. Step 1

    Site & Interconnection

    Site control established and distribution interconnection coordinated with the utility.

  2. Step 2

    Transformer Installation

    13.8 kV distribution infrastructure and transformer installation completed on site.

  3. Step 3

    Equipment Deployment

    Electrical equipment and balance-of-site infrastructure deployed and commissioned.

  4. Step 4

    Energization

    Project energized in 2025.

  5. Step 5

    Operations

    Transitioned to continuous operation and ongoing site management.

Optional Inputs

BESS and on-site generation

Where the site and market support it, storage and generation are integrated alongside utility delivery to improve flexibility, firming, and schedule.

BESS Integration

Storage evaluated for flexibility, firming, and participation in ERCOT market products. Configuration is project-specific.

On-Site Generation

Natural gas and on-site generation opportunities assessed against gas access, permitting, and delivery schedule.

Standalone storage

Beyond storage integrated into a load, MetalWave develops standalone battery storage sites across ERCOT — with the land, interconnection, and equipment supply chain behind them.

Energy Storage

Access to REP, LSE, and QSE capabilities through affiliated companies. Through affiliated energy-market entities, MetalWave integrates retail power procurement, load management, scheduling, and ERCOT market participation into its infrastructure platform.

Energy

Start from the power, not the parcel

Tell us your load profile, required capacity, and target energization date. We will tell you what is realistically deliverable in ERCOT and when.