Clifton Data Center Campus

74 MW development opportunity in Bosque County, Texas.

Target Capacity
74 MW
Site Area
±14 Acres
Power Delivery
138 kV
Market
ERCOT North
Utility
TNMP
Target Energization
Q3 2027

Project Overview

A power-first campus opportunity

Clifton is MetalWave's priority data center development project. The site is land controlled, cleared, and generally development-ready, located in TNMP service territory with planned 138 kV power delivery and a nearby substation. Its position in the ERCOT North zone places it within reach of the DFW market while avoiding the land and power constraints of the metroplex itself.

Clifton is positioned for customers who need meaningful capacity near a major market without competing for constrained metro power. The site is land controlled, cleared, and generally development-ready, which removes a significant part of the schedule risk that typically sits at the front of a data center development.

  • Bosque County, Texas
  • Approximately 90 minutes from DFW
  • Land controlled / owned
  • Cleared and generally development-ready site
  • TNMP service territory
  • Planned 138 kV delivery
  • Nearby substation
  • Municipal water availability
  • Fiber redundancy planned / available as supported by project materials

Locator

CliftonBosque County · ERCOT North
Market
ERCOT North
County
Bosque County, Texas
Distance to DFW
~90 minutes
Aerial view of the cleared Clifton development site in Bosque County, Texas
Clifton site aerial — Bosque County, Texas
Ground-level view across the cleared Clifton site
Cleared, generally development-ready terrain

Site

±14 acres, cleared and development-ready

The site comprises approximately 14 acres in Bosque County, controlled by MetalWave. It has been cleared and is generally development-ready, with geometry suited to a phased campus layout.

Site area
±14 acres
County
Bosque County, Texas
Land status
Controlled / owned
Site condition
Cleared, generally development-ready
Zoning / permitting status
Available upon request
Survey and geotechnical
Available upon request

Power

Planned 138 kV delivery in TNMP territory

Clifton targets 74 MW of capacity with planned 138 kV delivery. The site sits in TNMP service territory with a nearby substation, in the ERCOT North zone. Target energization is Q3 2027 — a development target, not a commitment or a contracted date.

Target capacity
74 MW
Delivery voltage
138 kV (planned)
Utility
TNMP service territory
ERCOT zone
ERCOT North
Substation
Nearby substation
Target energization
Q3 2027
Interconnection study status
Available upon request
Executed utility agreements
Available upon request

Capacity, voltage, and schedule reflect current development targets. Utility commitments, study outcomes, and interconnection agreements are confirmed through project documentation and are available to qualified counterparties.

Water

Municipal water availability

Municipal water availability supports the site. Volumes, service commitments, and any cooling-specific water requirements are evaluated on a project-specific basis against the selected cooling design.

Water source
Municipal water availability
Committed volume
Available upon request
Service agreement status
Available upon request
Cooling design
Project-specific

Fiber

Fiber redundancy planned

Fiber redundancy is planned and available as supported by project materials. Carrier identities, route diversity, and latency characteristics are confirmed through project documentation rather than asserted here.

Redundancy
Planned / available as supported by project materials
Carriers
Available upon request
Route diversity
Available upon request
Latency to DFW
Available upon request

Access

Approximately 90 minutes from DFW

The site is approximately 90 minutes from the Dallas–Fort Worth market, placing it within practical reach for construction logistics, staffing, and operations while sitting outside the metro’s land and power constraints.

Nearest major market
Dallas–Fort Worth
Approximate drive time
~90 minutes
Region
Bosque County · ERCOT North
Road access
Site access available
Road access at the edge of the Clifton development site
Site access
Wide view of the Clifton site at dusk
Clifton site, looking west

Development Timeline

Sequence toward Q3 2027 target energization

  1. Step 1

    Site control and clearing

    Land controlled / owned. Site cleared and generally development-ready.

  2. Step 2

    Utility engagement

    Engagement within TNMP service territory around planned 138 kV delivery.

  3. Step 3

    Study and design coordination

    Interconnection study coordination and infrastructure design advanced in parallel.

  4. Step 4

    Infrastructure construction

    Substation, transformers, switchgear, and balance-of-site works.

  5. Step 5

    Target energization

    Q3 2027 target energization. Schedule is a target, not a commitment.

Timeline stages describe the development sequence. Q3 2027 is a target energization date and is subject to utility, study, permitting, equipment, and construction outcomes.

Concept Site Plan

Indicative layout and power path

A simplified plan showing the site boundary, indicative development areas, the substation position, and the planned power route. Not an engineering drawing.

SITE BOUNDARY · ±14 ACRESINDICATIVEDEVELOPMENT AREAPHASE 2(INDICATIVE)SUBSTATIONPLANNED 138 kV DELIVERYSITE ACCESSN
Concept site plan. Boundaries, development areas, substation position, and power routing are indicative and subject to design, survey, and utility confirmation.

Due Diligence Availability

Documentation released to qualified counterparties

MetalWave maintains project documentation covering site, title, utility, environmental, and permitting workstreams. Materials are released to qualified counterparties under an appropriate agreement. Where a parameter is not confirmed, it is marked as available upon request rather than estimated.

Site and title documentation
Available upon request
Utility correspondence
Available upon request
Study records
Available upon request
Environmental and permitting
Available upon request
Concept design materials
Available upon request
Data room access
Qualified counterparties

Request Site Package

Get the Clifton site package

Tell us your required capacity, target COD, and use case. We will respond with the materials relevant to your requirement and, where appropriate, arrange data room access.

Direct contact

Required. We use these details only to respond to your inquiry.

Site packages and due diligence materials are released to qualified counterparties. Detailed project documentation is available upon request.